
The poured mold box is transported by friction wheels to the brazing position, where the brazing truck inserts the mesh cage into the mold box, which is then transported by the ferry to the pre-conditioning room for maintenance. The ferry car transports the mold box to the designated position through precise positioning. After the billet reaches the cutting requirement, it is transported to the braze pulling position by the ferry car, and then the braze frame is pulled out as a whole, and then transported to the turning spreader by the friction wheel.

The ferry trolley is used for transporting mould boxes in aerated concrete production line. It horizontally transfers mould boxes among pouring station, bar inserting station, static curing room and bar pulling station. It supports accurate automatic positioning and smoothly conveys mould boxes with green bodies, connects different working procedures to ensure continuous operation of the production line and improve overall working efficiency.

The friction wheel drives the mould box to travel longitudinally on the track by friction between the wheel and the base of the mould box, realizing stable transportation of mould boxes between different stations. It connects ferry trolley, bar inserting, bar pulling, turnover and other procedures. With low impact during operation, it prevents vibration damage to green bodies and ensures continuous conveying of the production line.

The poured mold box is transported by friction wheels to the brazing position, where the brazing truck inserts the mesh cage into the mold box, which is then transported by the ferry to the pre-conditioning room for maintenance. The ferry car transports the mold box to the designated position through precise positioning. After the billet reaches the cutting requirement, it is transported to the braze pulling position by the ferry car, and then the braze frame is pulled out as a whole, and then transported to the turning spreader by the friction wheel.

The ferry trolley is used for transporting mould boxes in aerated concrete production line. It horizontally transfers mould boxes among pouring station, bar inserting station, static curing room and bar pulling station. It supports accurate automatic positioning and smoothly conveys mould boxes with green bodies, connects different working procedures to ensure continuous operation of the production line and improve overall working efficiency.

The friction wheel drives the mould box to travel longitudinally on the track by friction between the wheel and the base of the mould box, realizing stable transportation of mould boxes between different stations. It connects ferry trolley, bar inserting, bar pulling, turnover and other procedures. With low impact during operation, it prevents vibration damage to green bodies and ensures continuous conveying of the production line.

Package with pallets section
Cured blocks are delivered to the autoclave outlet line by ferry cart, then moved to depalletizing cranes. The cranes se...
Grouping section
The steaming trolley is delivered to the grouping spreader for loading semi-finished green bodies. Cutting waste is conv...
Cutting section
In the cutting section, the tilting spreader rotates the mould box by 90° and places it onto the first cutting trolley, ...
Shandong Hongfa Scientific Industrial&Trading Co.,Ltd ©️2026Copyright © LU ICP B 16041216-4